NOTE:
The rollover valve cannot be removed as it is built into the fuel tank.
1. Remove the fuel tank..
Rollover Valve Inspection [Mzr 2.0, Mzr 2.5]
Warm Up Three Way Catalytic Converter (Wu Twc) Inspection [Mzr 2.0, Mzr 2.5]Engine Tune Up [Mzr 2.3 Disi Turbo]
NOTE:
If the accelerator pedal is depressed continuously for a specified time,
the engine speed may decrease to the idle speed. This is due to the fuel cut
control operation, which prevents overheating, and it does not indicate a malfunction.
Engine Tune-up Preparation
1. Verify ...
Door Lock Switch Inspection
1. Disconnect the negative battery cable..
2. Remove the inner garnish..
3. Remove the front door trim..
4. Remove the front inner handle..
5. Inspect for continuity between the door lock switch terminals using an ohmmeter.
If not as indicated in the table, replace the door lock ...
Headlight Leveling Switch Removal/Installation
1. Disconnect the negative battery cable..
2. Remove the switch panel in the direction of the arrow shown in the figure.
3. Disconnect the connector.
4. Remove the headlight leveling switch in the direction of the arrow (2) shown
in the figure while pressing the tabs in the direction of ...