1. Disconnect the negative battery cable..
2. Remove nuts A and B shown in the figure.

3. Remove the main fuse.
4. Install in the reverse order of removal.
Front Fog Light Relay Removal/Installation
Relay Block Inspection [With Advanced Keyless Entry And Push Button Start System]Purge Solenoid Valve Removal/Installation [Mzr 2.0, Mzr 2.5]
1. Remove the battery cover..
2. Disconnect the negative battery cable..
3. Remove in the order indicated in the table.
1
Purge solenoid valve connector
2
Evaporative hose
(See Evaporative Hose Installation Note.)
3
...
Contact Authorized Mazda Dealer and Have Vehicle Inspected
If any of the following warning lights or the indicator light turns on/flashes, the system may
have a malfunction. Contact an Authorized Mazda Dealer to have your vehicle
inspected.
...
Front Scuff Plate Removal/Installation
1. Detach tab A while pulling the front scuff plate in the direction of the arrow
(1) shown in the figure, then detach hook B, clips C, and pins D while pulling in
the direction of the arrow (2).
2. Detach tab E while pulling the front scuff plate in the direction of the arrow
(3) shown in t ...