Voltage Inspection
1. Connect the M-MDS to the DLC–2.

2. Switch the ignition to ON.
3. Verify that the MAP sensor output voltage (PID: MAP) is within the specification..
If not as specified, replace the MAP sensor..
Variable Intake Air Solenoid Valve Inspection [Mzr 2.0, Mzr 2.5]
Manifold Absolute Pressure (Map) Sensor Removal/Installation [Mzr 2.0, Mzr 2.5]Front Door Key Cylinder Switch Inspection
1. To access the glass installation bolt, position the front door glass so that
the distance from the top of the front door glass to the upper part of the front
beltline molding is approx. 80 mm {3.1 in}.
2. Disconnect the negative battery cable..
3. Remove the following parts:
a. Inne ...
Caliper (Front) Disassembly/Assembly [Mzr 2.0, Skyactiv G 2.0, Mzr 2.5]
1. Disassemble in the order indicated in the table.
1
Bleeder cap
2
Bleeder screw
3
Piston
(See Piston Disassembly Note.)
(See Piston Assembly Note.)
4
Dust seal
(See Dust Seal ...
Manual Transaxle Removal/Installation [G35 M R]
CAUTION:
Secure the steering wheel using tape or a cable to prevent the steering shaft
from rotating after disconnecting the steering shaft. If the steering wheel
rotates after the steering shaft and the steering gear and linkage are disconnected,
the internal parts of the clock spr ...