Continuity Inspection
1. Remove the battery cover..
2. Disconnect the negative battery cable..
3. Disconnect the neutral switch connector..
4. When the shift lever is in neutral and in a position other than neutral, verify that the continuity between neutral switch terminals A and B is according to the following table:

If not as verified, replace the neutral switch..
Ion Sensor Inspection [Skyactiv G 2.0]
PCM Configuration [Mzr 2.0, Mzr 2.5]Headlight Leveling Switch Inspection
1. Disconnect the negative battery cable..
2. Remove the headlight leveling switch..
3. Verify that the resistance and continuity between the headlight leveling switch
terminals is as indicated in the table.
If not as indicated in the table, or if the resistance is not within the
...
Theft Deterrent System Reading Freeze Frame Data
1. Connect the M-MDS (IDS) to the DLC–2.
2. After the vehicle is identified, select the following items from the initialization
screen of the IDS.
Select “Body”.
Select "Burglar Service Functions".
3. Then, select the following item from the screen menu. ...
Air Bag Module And Pre Tensioner Seat Belt Disposal Procedures
WARNING:
A live (undeployed) air bag module or pre-tensioner seat belt may accidentally
operate (deploy) when it is disposed of and cause serious injury. Always refer
to the “AIR BAG MODULE AND PRE-TENSIONER SEAT BELT DEPLOYMENT PROCEDURES” and
dispose of air bag modules and p ...